Brief Description of Selective Study Case No. 1:
Major Structural Engineered Rehabilitation & Repair, and Structural Optimization of Deteriorated Boston Marginal Conduit (BMC) Tunnel (Height: 12 Ft. / Across: 10 Ft.) using Structural Warren Epoxy and High Strength Carbon Reinforced Polymer for Structurally Robust Long Term Useful Operational Life. Asset Owner: Massachusetts Water Resources Authority (MWRA). BMCs material of construction is Un-Reinforced Concrete, and it is over 100 years old. BMC Tunnel System is Vital & Essential Infrastructure for downtown Boston because it is a major collector of Sewer Wastewater and Stormwater.


