Brief Description of Selective Study Case No. 1:
(Height: 12 Ft. / Across: 10 Ft.) using Structural
Warren Epoxy and High Strength Carbon Reinforced Polymer for Structurally Robust Long Term Useful Operational
Life. Asset Owner: Massachusetts Water Resources Authority (MWRA). BMCs material of construction is Un-Reinforced
Concrete, and it is over 100 years old. BMC Tunnel System is Vital & Essential Infrastructure for downtown Boston
because it is a major collector of Sewer Wastewater and Stormwater.