Warning: strtotime(): It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected the timezone 'UTC' for now, but please set date.timezone to select your timezone. in /home/madero/public_html/libraries/joomla/utilities/date.php on line 56

Warning: date(): It is not safe to rely on the system's timezone settings. You are *required* to use the date.timezone setting or the date_default_timezone_set() function. In case you used any of those methods and you are still getting this warning, you most likely misspelled the timezone identifier. We selected the timezone 'UTC' for now, but please set date.timezone to select your timezone. in /home/madero/public_html/libraries/joomla/utilities/date.php on line 198

D. C. Cook Nuclear Power Station - Bridgman, MI
American Electric Power (AEP)

Project Description: Managed a Power Operated Valve
(POV) Program at AEP’s D. C. Cook Nuclear Power
Station. This nuclear station is made up of two
Westinghouse’s Pressurized Water Reactors with a
combined electrical output of 2200 Megawatts.

Services Provided:
Responsibilities included but were not limited to:

DC_Cook2

♦  Management of the implementation of the
POV program in a quality, timely and
efficient manner. Supervision of multi-
discipline project engineering team. Project
was characterized by aggressive schedule
and completion dates with limited resources when
comparedagainst the magnitude of the scope
of work.

♦  Generation and implementation of process
improvements strategies for work activities,
data management and documentation,
including equipment database and software

♦  Revised POV Program Procedures which
included identification of methodologies,
organizations, responsibilities, interfaces,
procedures, and controls necessary for
program implementation

♦  Development and implementation of Setpoint
Control calculations for maintenance
department usage in testing activities.

♦  Responsible for the generation of Mechanical
and Electrical System and Component level
design basis review calculations

♦  Involved in the establishment of component
diagnostic testing strategies, acceptance
criteria, and frequencies

♦  Design basis reconstitution and reconciliation

♦  Design changes and modifications

♦  Engineering activities intended to improve

♦  Provided Personnel Training as related to the
development, implementation and
maintenance of POV program

♦  Provided engineering support to field
activities related to POV testing and
component modifications.

♦  Supported the utility during regulatory body
audits and in the preparation of the applicable
audit documents.

♦  Resolution of design, operational and
licensing non-conformances.

♦  Structural evaluations.

 

Contact Us

Main Office in USA
logo madero blue red with YELLOW globe
3315 Ashlock Drive
Houston, TX 77082 - USA
Phone: (281) 610-0367
Email: info@madero.net
Website: www.Madero.Net
   
Branch Offices in Latin America:
MADERO Brazil Logo
Rua Ciclames 866, Villa Lucia
Sao Paulo, SP CEP 03146-010 - Brasil
Phone: 011 55 (11) 97543-1812
Email: Info@MADERO.Net
   
 MADERO EA SA - ECUADOR
Via Puntilla / Sanborondon Km 10
Guayaquil - Ecuador
Phone: 011 593 99-216-6201
Email: Info@MADERO.Net
 
MADERO LOGO for mexico
Londres # 59 Fracc Monte Negro
Jalapa - Mexico
Phone: 011 52 1 (229) 128 8063
Email: Info@MADERO.Net